Order of change work supervision


Through this form, you can conveniently order shareholder alteration work supervision. The desired time for the inspection visit should be indicated approximately 3 working days in advance, so that we can arrange a meeting time suitable for all participants in the inspection.

The inspections are documented with photographs, and the report is sent electronically to the client and the housing company’s property manager.

Order change work supervision

  • One space to be renovated per apartment

    Select the inspection visits to be ordered by clicking on the box in front of the row. You can choose one or multiple options from the list.
  • Multiple spaces to be renovated per apartment

    Select the inspection visits to be ordered by clicking on the box in front of the row. You can choose one or multiple options from the list.
  • Customer information

  • (e.g. “kitchen” / “bathroom” / “kitchen and bathroom”)
  • The address is also used as the billing address if the customer does not provide a separate billing address on the form.
  • Type the phone number in international format starting with +358
  • MM slash DD slash YYYY
    Choose the preferred monitoring visit date.
  • Drop files here or
    Accepted file types: jpg, jpeg, gif, png, pdf, heic, Max. file size: 20 MB, Max. files: 5.
      Please add any attachments, such as the alteration work description, contact details of contractors, and a copy of the alteration work approval message.
    • This field is hidden when viewing the form
    • This field is for validation purposes and should be left unchanged.

    Didn’t find what you were looking for? Please contact us.